POWER SYSTEM COMMISSIONING AND TESTING

Even the best design systems require testing to prove they will function as designed once installed. Sometimes there has been a change in the infrastructure that impacts how a previously installed system will function. And even the most reliable equipment wears out.

Testing of this equipment when it is first installed, at the industry recommended intervals or when a failure has occurred helps ensure reliable operation.

Static Power offers several testing options:

  • IEEE Standards 450 and 1188 battery testing
  • Infrared scanning
  • Site acceptance testing
  • Artificial load testing of UPS and Generator systems

If you have a need or are unsure, contact a customer advocate for a free consultation.